Speed-to-market? There’s a system for that – Last Planner®.
The Last Planner® System (LPS) is a visual, collaborative way to plan, control and produce quality, predictable workflow by eliminating waste, optimizing resources and uncovering and solving problems. Primus is leading the design-build industry in the application of LPS. LPS and its lean-construction principles help our teams deliver on our clients’ number one goal: speed-to-market.
Download the LPS white paper to learn more about its advantages over traditional construction scheduling.